Asbestos Testing

Before we begin the removal of any asbestos, a member of our team will arrive at the site and then put on the correct protective wear, including suit, mask and boots, before safely removing a small sample of the area so that the asbestos testing can take place and it can be officially confirmed that asbestos is present.

Asbestos Testing

The small section is removed by a highly trained member of the Asbestos Fighters team, then double bagged, secured and sent to a testing company for analysis. Once the analysis has taken place, the results will show us what, if any, specific asbestos is present which will define whether the work will need to be completed licensed or un-licensed.

The analysis can take up to five working days and once we have the results, we can co-ordinate our team to get the asbestos removed and disposed of quickly and efficiently so works can continue on your development without affecting your planned completion date. We provide an emergency call out where we will be at your site within 24 hours to get the process of removal moving as soon as possible.

All the asbestos testing we conduct is done so following Health & Safety Executive recommendations.

Contact Asbestos Fighters today to get a free quote on the testing, removal and disposal of your asbestos.

How it works
Talk to
Asbestos Fighters

Find the service you need

Asbestos Fighters arrive
at your property

And carry out your chosen service

Be Asbestos free

Live and Work safely

Why choose us
Experience
Over 25 Yearsfighting asbestos
By using our wealth of asbestos expertise, Asbestos Fighters create a safer environment for businesses and residential communities.
Trust
  • 4.9
  • Asbestos Testing Stars
Asbestos Fighters are passionate about providing quality services by delivering honest advice and on-site surveys.
Our Promise
Asbestos Testing Rosette
By delivering asbestos services we are proud to say we are saving lives in the construction industry and the community we all live in.
Case Studies

Asbestos Shed Removal, Hertfordshire

One of our remarkable teams successfully aided a client in the meticulous asbestos shed removal, ensuring its safe extraction down to the very foundation level. With unparalleled expertise and adherence to stringent safety protocols, our team diligently dismantled and disposed of the hazardous materials, mitigating any potential risks associated with asbestos exposure.

The process involved a comprehensive assessment of the site, meticulous planning, and the utilisation of cutting-edge equipment designed to handle asbestos abatement. Our proficient experts dismantled the shed, employing state-of-the-art techniques to prevent the dispersion of asbestos fibres into the environment.

Prioritising safety as the utmost concern, our team sealed and contained the area throughout the removal process, utilising advanced engineering controls to prevent the spread of any particulates. Rigorous decontamination procedures were followed, leaving the site entirely free from any residual traces of asbestos contamination.

Ultimately, through the dedicated efforts of our adept team, the client's property was effectively cleansed of asbestos, eliminating any potential health hazards. This accomplishment underscores our commitment to ensuring not only the successful execution of complex projects, but also the well-being of our clients and the environment.

Asbestos Insulation Board Removal, SW London

The meticulous process of Asbestos Insulation Board removal demands paramount attention and precision. Such was the case in a recent job undertaken in the under stairs cupboard of a property situated in the vibrant landscape of SW London. The significance of this operation was underscored by the stringent adherence to Fully Controlled Conditions, a comprehensive framework ensuring that every facet of the removal procedure was scrupulously managed to prevent any potential release of harmful asbestos fibres.

Prior to the commencement of this intricate task, a 14-day notification period was observed, as mandated by the Health and Safety Executive (HSE). This allowed for the orchestration of a meticulously calculated plan that encompassed every conceivable precaution. Our team of dedicated professionals, equipped with specialised gear and an unwavering commitment to safety, embarked on this mission.

Despite the inherent complexities of asbestos abatement, the team showcased their expertise by seamlessly completing the project within a single day. This feat not only underscored their efficiency but also exemplified the gravity of preparation and organisation involved in handling hazardous materials.

The successful execution of the Asbestos Insulation Board removal project under the confined space of an under stairs cupboard in SW London stands as a testament to the significance of meticulous planning, adherence to regulations, and the proficient execution of intricate procedures when dealing with hazardous materials.

Asbestos Cement Water Tank Removal, Buckinghamshire

We were asked by a plumbing and heating specialist to complete an asbestos cement water tank removal for one of their customers.
We work with this company regularly - they care about the health and safety of their team and their clients - and they appreciate the quality of service they receive from us is consistent and we are reliable and get the job done quickly without delaying their own time frame.

Asbestos Insulation Board Removal & Disposal, Old Coulsdon, Croydon

We removed the Asbestos Insulation Boards fire break between the two properties loft spaces under fully controlled conditions. Due to the layout and dimensions of the property, the airlocks were located on the ground floor and connected to the enclosure on the landing by a tunnel. We designed the enclosure to be free standing as far as reasonably practical and was only connected to the property’s hatch, which meant we were able to undertake our works safely without causing any damage to the décor.
Work for the asbestos insulation board removal included:
1. Several site visits and meetings to decide on the best plan of action for all parties;
2. Undertook the risk assessment for all site hazards that would or could become issues during the removal;
3. Designed our enclosures and setups;
4. Produce the site-specific RAMs, site packs;
5. Allocated the Team, ordered the materials and plant and planned the mobilisation;
6. The team and the manager met on the first morning of the project and went through the whole programme during a site walk around;
7. Then the site was set up and the works were undertaken;
8. After the air testing, we installed a new fire barrier in the loft space between the two loft spaces.
Testimonials
The guys were all very nice and cleared up after them very well.

Asbestos Roof Sheet Removal Testimonial

We would highly recomend.

Tina Patel

On request they responded very quickly and provided helpful advice...

Cristina Imbuzan

The attention to detail and care they take with the serious nature of their business is second to none.

Element Electrical Contractors Ltd