Work carried out
Pipe insulation debris removal
Location
Havering-atte-Bower, Essex
Type of Asbestos
Amosite Chrysotile Asbestos Pipe Insulation Debris
Project Description
This pipe insulation debris was removed from this client's piano room in their home under fully controlled conditions.
When carrying out pipe insulation debris removal work, we are required to give 14 days notification prior to the asbestos works beginning. Our team prepared a Plan of Work and had it verified before we submitted the ASB5 Notification to the Health & Safety Executive (HSE).
The asbestos removal work was carried out under fully controlled conditions, under a negative pressure unit. A Decontamination Unit, including Welfare and WC, was located on the front of the house, and we had all transit procedures in place.
All the work was completed in two days.
When carrying out pipe insulation debris removal work, we are required to give 14 days notification prior to the asbestos works beginning. Our team prepared a Plan of Work and had it verified before we submitted the ASB5 Notification to the Health & Safety Executive (HSE).
The asbestos removal work was carried out under fully controlled conditions, under a negative pressure unit. A Decontamination Unit, including Welfare and WC, was located on the front of the house, and we had all transit procedures in place.
All the work was completed in two days.