AIB Asbestos Insulation Board Removal

Asbestos Insulation Board Removal – these insulating boards have been used for fire protection, heat and sound insulation, acoustic insulation, resistance to moisture movement and general building board. It is a lightly compressed board that is made from asbestos fibre and hydrated Portland cement—or calcium silicate with other filler materials— usually found in homes constructed in the ’60s and ’70s. It is unlikely to be found in buildings constructed after 1982. There are several modern substitutes which are now used as an alternative to asbestos boarding.

Asbestos Insulating boards can be commonly found in: Ceiling Tiles, Wall Panels, Fire Doors, Window Panels, Soffits, Boxing around structural steelwork, Lift shafts,

Asbestos Insulation Board 2
We have completed asbestos insulating board removals from homes and businesses throughout the country. We carry out asbestos testing before the works take place to ensure that it is done so with the correct equipment and workwear to ensure the safety of both our team and any members of the public. We have never and will never compromise on safety.

You may be aware that asbestos is extremely hard to detect and it is imperative that its removal is left to the experts. Asbestos Fighters provide a fast turnaround so any project you have underway when the presence of asbestos is suspected does not need to be delayed – our 24/7 emergency call out ensures this.

Our team are able to carry out asbestos testing, asbestos removal, and asbestos disposal as well as our 24-hour emergency call-out when your job is time-sensitive.

Contact the team today to find out more about our asbestos flue removal and see how we can make the removal process simple for you.

Our testimonials page shows just a small proportion of the satisfied customers we have had – take a look and see what they have to say.

If you have any concerns at all that there may be asbestos present in your property, contact the Asbestos Fighters team today and see how we can help you.

How it works
Talk to
Asbestos Fighters

Find the service you need

Asbestos Fighters arrive
at your property

And carry out your chosen service

Be Asbestos free

Live and Work safely

Why choose us
Experience
Over 25 Yearsfighting asbestos
By using our wealth of asbestos expertise, Asbestos Fighters create a safer environment for businesses and residential communities.
Trust
  • 4.9
  • AIB Asbestos Insulation Board Removal Stars
Asbestos Fighters are passionate about providing quality services by delivering honest advice and on-site surveys.
Our Promise
AIB Asbestos Insulation Board Removal Rosette
By delivering asbestos services we are proud to say we are saving lives in the construction industry and the community we all live in.
Case Studies

Asbestos Insulation Board Removal, SW London

The meticulous process of Asbestos Insulation Board removal demands paramount attention and precision. Such was the case in a recent job undertaken in the under stairs cupboard of a property situated in the vibrant landscape of SW London. The significance of this operation was underscored by the stringent adherence to Fully Controlled Conditions, a comprehensive framework ensuring that every facet of the removal procedure was scrupulously managed to prevent any potential release of harmful asbestos fibres.

Prior to the commencement of this intricate task, a 14-day notification period was observed, as mandated by the Health and Safety Executive (HSE). This allowed for the orchestration of a meticulously calculated plan that encompassed every conceivable precaution. Our team of dedicated professionals, equipped with specialised gear and an unwavering commitment to safety, embarked on this mission.

Despite the inherent complexities of asbestos abatement, the team showcased their expertise by seamlessly completing the project within a single day. This feat not only underscored their efficiency but also exemplified the gravity of preparation and organisation involved in handling hazardous materials.

The successful execution of the Asbestos Insulation Board removal project under the confined space of an under stairs cupboard in SW London stands as a testament to the significance of meticulous planning, adherence to regulations, and the proficient execution of intricate procedures when dealing with hazardous materials.

Asbestos Insulation Board Removal & Disposal, Old Coulsdon, Croydon

We removed the Asbestos Insulation Boards fire break between the two properties loft spaces under fully controlled conditions. Due to the layout and dimensions of the property, the airlocks were located on the ground floor and connected to the enclosure on the landing by a tunnel. We designed the enclosure to be free standing as far as reasonably practical and was only connected to the property’s hatch, which meant we were able to undertake our works safely without causing any damage to the décor.
Work for the asbestos insulation board removal included:
1. Several site visits and meetings to decide on the best plan of action for all parties;
2. Undertook the risk assessment for all site hazards that would or could become issues during the removal;
3. Designed our enclosures and setups;
4. Produce the site-specific RAMs, site packs;
5. Allocated the Team, ordered the materials and plant and planned the mobilisation;
6. The team and the manager met on the first morning of the project and went through the whole programme during a site walk around;
7. Then the site was set up and the works were undertaken;
8. After the air testing, we installed a new fire barrier in the loft space between the two loft spaces.

AIB Panel Removal

AIB Panel Removal and disposal under Fully Controlled Condition (FCC)

We helped our client to remove and dispose asbestos safely and efficiently. This type of work was Notified to HSE – 14 Days Notification prior to removal work.

All process started from single site visit where we have assessed garage ceiling AIB panel removal. Our client has had a leak through old roof, and re-roofing work could not be carried out without asbestos removal by fully licensed contractor. We took all measurements and we provided quotation within 24 hours.

Upon acceptance, we start preparation of Plan of Work included full list of equipment and materials required to complete this project safely.

Once all paperwork was fully verified by another asbestos manager, we submitted ASB5 Notification to HSE and we placed the order with our suppliers.

Job took five days from start to completion.

Asbestos Insulation Board Removal – Haynes, Bedfordshire

We helped our client to remove and dispose asbestos safely and efficiently. This type of work was Notified to HSE – 14 Days Notification prior to removal work.

All process started from single site visit where we have assessed garage ceiling. Our client has had a leak through old roof, and re-roofing work could not be carried out without asbestos removal by fully licensed contractor. We took all measurements and we provided quotation on spot.

Upon acceptance, we start preparation of Plan of Work included full list of equipment and materials required to complete this project safely.

Once all paperwork was fully verified by another asbestos manager, we submitted ASB5 Notification to HSE and we placed the order with our suppliers.

One day before work started, we came to site with a supervisor and one of our operatives to walk through the project and to take deliveries from our suppliers.

Job started on Saturday and was fully completed by Sunday 4PM.
Testimonials
The guys were all very nice and cleared up after them very well.

Asbestos Roof Sheet Removal Testimonial

We would highly recomend.

Tina Patel

On request they responded very quickly and provided helpful advice...

Cristina Imbuzan

The attention to detail and care they take with the serious nature of their business is second to none.

Element Electrical Contractors Ltd

Google Reviews